Industrial Unit & Offices


New Production Facility

Construction of a new Industrial Unit comprising of a large internal Warehouse with office space on two floors. The building has been constructed on a structural steel frame founded on concrete pad foundations. Masonry walls have been constructed from the concrete foundations up to first floor height. The remaining wall areas from first floor level to roof level are covered with insulated cladding sheets. Double glazed aluminium windows have been installed in the ground and first floor office external walls and an aluminium curtain walling system has been installed to the main entrance.

The roof is covered with insulated cladding sheets. Walk in gutters and a “Man-Safe” system have been installed to aid maintenance at roof level. A Syphonic drainage system has been installed to allow rainwater to drain from the roof into the new storm water drainage system. Dock levellers and loading bay doors have been provided within the Warehouse perimeter for distribution purposes.